Immaculate Conception Church Parish Elementary School Addition

Location

Fayetteville, NY

Client:

Immaculate Conception Church

Service:

Architecture

Industry:

Education

Project Overview:

This project doubled the size of Immaculate Conception’s existing elementary school and was implemented on a fast-track schedule to allow for occupancy 9 months after the work began.  Eleven classrooms and a multi-purpose cafeteria were added as part of the 21,000 SF addition.  NKB served as the Owner’s agent performing construction management duties overseeing design and construction phases, programming, schematic and contract documents. During the design phase, NKB conducted constructability and value engineering reviews of the design documents prepared by the Architectural Designer.

Project Fact:

This fast track project was constructed within a 9-month  window.

Project Tags:

Feasibility Study, Construction Documents, Construction Administration, Inspection Services, Commissioning Services, Education Design, Construction Management, Cafeteria Design, Value Engineering